Food Services

Food service activities may be viewed by a firm as a:

Necessity

Convenience

Luxury 

Food Service facilities should be planned by considering the number of employees who eat in the facilities during peak activity time.

Kitchen facilities should be planned by considering the total number of meals to be served. For the determination of the kitchen size, use Table 3. Kitchen size should be based on the Number of Meals Served per Lunch Shift x Total Number of Lunch Shifts.

If employees eat in shifts, the first third of each lunch shift will typically be used by the employee preparing to eat and obtaining the meal. Two thirds of the lunch shift will be spent at a table eating.

Figure 1

If a 30- min. meal break is planned, dining shifts may begin every 20 min. Similarly, if a 45 -min. break is planned, lunch shifts may begin every 30 min. Table 1 shows an example for four 30-min. lunch shifts.

Beginning of Lunch Break

Time Sat Down in Chair

End of Lunch Break

11:30 a.m.

11:40 a.m.

12:00 noon

11:50 a.m.

12:00 noon

12:20 p.m.

12:10 p.m.

12:20 p.m.

12:40 p.m.

12:30 p.m.

12:40 p.m.

1:00 p.m.

Table 1. Shifting Timing for 30-min. Lunch Breaks ( four lunch shifts)

Food services requirements may be satisfied by any of the following alternatives:

 Dining away from the facility

 Vending machines and cafeteria

 Serving line and cafeteria

 Full kitchen and cafeteria

The first alternative simplifies the task of the facilities planners. However, requiring employees to leave the facility for meals results in some disadvantages:

 Meal breaks must be longer.

 Employee supervision is lost (returning to work late, returning to work intoxicated, not returning to work)

 Loss of interaction.

 Loss of worker concentration on the tasks that must be performed.

If dining away from the facility is not favorable, the remaining food service alternatives require a cafeteria. Cafeteria can also be utilized for purposes, such as auditorium, in addition to standard employee meals. Also, movable partitions may be used to create conference rooms and more private luncheon meeting rooms.

An integral part of cafeteria is the food preparation and serving facilities. The option of a serving line or full-service kitchen will be contingent on the number of employees to be served. If a facility employs over 200 people, a serving line is a feasible alternative.

Space requirements for cafeterias should be based on the maximum number of employees to eat in the cafeteria at any one time. Table 2 gives general area requirement guidelines. The space allocated within the ranges given in Table 2, should be determined by the type of tables to be utilized. Table sizes may be 36-, 42-, and 48-in. square tables and rectangular tables 30 in. wide and 6, 8, and 10 ft long. Square tables require more aisle space than rectangular tables. Table sizes depend on whether or not the employees retain their trays during the meal. A 36-in. square table is adequate for four employees if they do not retain their trays. 48-in tables are the most suitable ones if the employees retain their trays.

Classification

Square Feet Allowance per Person

Commercial

16-18

Industrial

12-15

Table 2. Space requirements for Cafeterias

If 36-in. square tables are used, an average figure from Table 2 should be selected. For example, a cafeteria in a commercial establishment with 36 -in. square tables would require (16+18)/2 = 17 square feet per person. For an industrial application, (12+15)/2 = 13.5 square feet per person should be used.

 If 42-in. square tables are used, select a value between the average and the highest values stated in Table 2. For example, use 14 square feet per person for an industrial establishment.

If 48-in.square tables are used, select the highest values given in Table 2.

Rectangular tables 6, 8, and 10 ft. long adequately seat three, four, and five employees, respectively, on each side of the table with no end seats.

If individual 6 ft rectangular tables are to be utilized, select an average space figure from Table 2.

If tables are placed end to end which seat between 6 and 12 people, select figures between the average and the lowest figures given in Table 2.

If more than 12 people may be seated in a row of tables, the lowest figures given in Table 2 should be selected for square foot allowance per person.

For space planning purposes 1 ft2 per person should be allowed for the vending machine area, based on the maximum number of persons eating at one time.

If a facility employs over 200 people, a serving line is a feasible alternative. When a serving line is utilized, a caterer is frequently contracted to prepare all food off site and to serve the food to employees. The advantage of serving lines is that they offer employees the benefits of a full kitchen but require little effort by the management of the facility. The cost of a meal is often quite competitive with the cost of running a full kitchen for facilities employing less than 400 people. A typical industrial serving line requires 300 ft2 and for design purposes 7 employees per minute is assumed to be served per serving line.

When a full-kitchen is used, a serving line and a kitchen must be included in the facility. A full kitchen can be justified economically only if there are over 400 employees within a facility. Table 3 shows the space requirements for full kitchens.

Number of Meals Served

Area Requirements (ft2)

100-200

500-1000

200-400

800-1600

400-800

1400-2800

800-1300

2400-3900

1300-2000

3250-5000

2000-3000

4000-6000

3000-5000

5500-9250

Table 3. Space Requirements for Full Kitchens

Food services should be located within 1000ft of all permanent employee workstations. If employees are required to travel more than 1000 ft, decentralized food services should be considered.

If the cafeteria is within 400 ft of most employees, rest breaks should be confined to the cafeteria. If a cafeteria serving line exists and it may be used to dispense drinks and snacks, and it should be used for breaks. If a serving line does not exist, drinks and snacks should be available in the cafeteria from vending machines.

If the cafeteria is more than 400 ft from most employees, some vending machines should be located within the facility to reduce employee travel time.

Drinking fountains should be located within 200 ft of any location where employees are regularly engaged in work. Local building codes should be consulted for determining their exact location. Drinking fountains should be conveniently located but must not be located where employees using drinking fountains may be exposed to a hazard. Drinking fountains are usually located near restrooms and locker rooms for the convenience of employees and because plumbing is readily available.

 

Sample Calculation

In an industrial facility 420 people are employed and they are to eat in four equal 30-minute shifts. 48-in. square tables are to be used. How much space should be planned for a cafeteria:

(a) with vending machines

(b) with serving lines

(c) with full kitchen and serving lines

Shifts for 30-min. lunch breaks:

First Lunch Shift 11:30 a.m. to 12:00 noon

Second Lunch Shift 11:50 a.m. to 12:20 p.m.

Third Lunch Shift 12:00 noon to 12:30 p.m.

Fourth Lunch Shift 12:30 p.m. to 1:00 p.m.

 

(a) Cafeteria Space: Assign 105 people for each lunch shift.

(420 people / 4 shifts = 105 people/lunch shift)

For square feet allowance, use Table 2 and select the upper value of 15 ft2/person for 48-in. square tables.

Cafeteria area = 15 ft2/person x 105 = 1575 ft2

Vending machine area = 1 ft2/person x 105 = 105 ft2

(Note that 1 ft2 per person is assigned for the vending machines).

Cafeteria with vending machines = 1575 + 105 = 1680 ft2

 

(b) Serving Lines: Assign 300 ft2 for each serving line and 7 people/min. per line. For a 30 min. lunch break, assign 1/3 of the lunch time for serving line. 1/3 x 30 min.= 10 minutes, which will be assigned for the serving line. Each serving line will handle 10 min. x 7 people/min. = 70 people. For 105 people per lunch shift, we need 105/70 @ 2 serving lines.

Serving line space requirement = 2 x 300 ft2 = 600 ft2

Cafeteria with two serving lines = 1575 + 600 = 2175 ft2

 

Full Kitchen:

Space planning for the kitchens is based on the total number of meals to be served. For 420 employees assign 420 meals. Table 3 gives 1400 - 2800 ft2 for 400 - 800 meals. Interpolation of the values will give 1470 ft2 for 420 meals served at lunch break.

Required kitchen space = 1470 ft2

Cafeteria with full kitchen and two serving lines = 1575 + 600 +1470 = 3645 ft2

 Back to Table of Contents

Last Update: October 15, 1999

Prepared by : Serdar Z. Elgun